How do I migrate domains from Clickmax V2 to V3?
Rebuild the content in V3 before switching the domain over:
- In V3, rebuild every funnel page that the domain currently serves.
- Only then reconnect the domain to the funnel in V3.
The domain on V2 stays live until the migration is finished, so there is no downtime if you follow that order. Reconnecting the domain before rebuilding the pages takes the site offline, because the destination does not exist in V3 yet.
Related
If it didn't work
- The site went offline after you reconnected it: the pages do not exist in V3 yet. Rebuild them and reconnect the domain afterwards — see create a page.
- The domain does not connect in V3: check the step-by-step in add a domain.
- Other errors while pointing the domain: see the error codes.